Cark Park Barrier

Automatic Car Park Barrier

CAME GT8-6M Barrier

Sawston, Cambridgeshire

Installed July 2024

REF: TBS24

THE NEW BENCHMARK FOR AUTOMATIC BARRIERS

With the GT series of automated barriers, CAME have once again created an innovative solution and set a new benchmark. Effective solutions designed with installer needs at the heart of the research and
development process. 2 models created to make installation, set up and commissioning easier than ever before.

Modern design, robust build quality and intelligence at the heart, the GT range is the most important barrier range Came have ever produced.

The elegantly shaped cabinet is designed for the integration of safety accessories.

The red/green LED lighting system eliminates the traditional flashing light and offers traffic light signalling for greater safety. It can be installed both on the cabinet structure and on the boom on both sides, and controls access by means of red, flashing red or green signalling.

Extreme durability

GARD GT4 has been tested for intensive use up to 350 CYCLES/hour.

GARD GT8 has been tested for intensive use up to 160 CYCLES/hour.

Both GARD GT4 & GT8 achieve 3 million mean cycles between failures.

File Upload

Please upload an image of where your gate is going to be installed. This will allow us to gain understanding of what is possible at your installation site as well as any potential issues we may spot.

Max upload size: 5mb

Accepted file types: jpg, jpeg, png

Gate Piers

The purpose of gate piers are to support gates as well as to define an entranceway. Please let us know if you plan to keep your existing piers and if you are, please select what material they are made from. Or, if you would like new or replacement piers, please select New and let us know what material you would like.

Gate Height

Simply let us know how high you would like your gates. From the floor to the highest point of the gate.

Gate Width

This measurement should be taken between the existing piers if you plan on keeping them. This measurement is indicated by the yellow arrow. If you would like us to install new piers as part of this project, please measure the total distance from where the left pier will start to where the right pier will finish and ensure you select 'New Piers' when asked later in the form. This measurement is indicated by the white arrow.